RE: per Matter's chat, had a steel delv or design issue(nm)
Posted on: August 17, 2018 at 10:40:54 CT
gregor macgregor MU
Posts:
207
Member For:
7.30 yrs
Level:
User
M.O.B. Votes:
0
I talked to a construction manager yesterday, according to him, drilling the structural foundations took them about a week longer than they expected. In a 13 month construction schedule, that's not huge deal.